05Equipment
EquipmentOur own jetty.
Where the yard meets the water. Pipe, plant, materials and crews are loaded here for swamp, creek and river locations across the Niger Delta.
The jetty
Our own jetty, where the yard meets the water.
Winsko's base on the Trans-Woji waterfront in Port Harcourt has its own jetty, and it is where all of the company's marine work is carried out. Pipe, plant, materials and crews are loaded here and go out to swamp, creek and river locations across the Niger Delta.
The 100,000 square metre base has a main gate and a second exit at the jetty, so loads move from the yard, the workshop and the warehouse straight to the quay. Low beds bring heavy plant to the water's edge, cranes load the barges and tug boats take them to site.
Winsko's barges, tug boats, speed boats and house boats are based here. One rule holds for staff and visitors alike at the water's edge: no life jacket, no entry.

By the numbers
- 10
- Barges
- Lay, ramp and dump barges, 400 t to 1,200 t, based at the jetty
- 80 t
- Track crane
- With tyre cranes of 22 t to 50 t, for lifting at the quay
- 40 t
- Low bed
- Mack low beds of 35 t and 40 t to bring plant to the water
- 100,000 m²
- Base
- Fenced yard with a second exit at the waterfront jetty
Scope of work · 06 work packages
What the work covers.
- 01
Barge loading
Cranes load pipe, plant and materials onto lay, ramp and dump barges alongside the quay.
- 02
Swamp and creek mobilisation
Swamp buggies, crews and materials go out from the jetty to swamp and creek locations.
- 03
Heavy plant to the waterfront
Mack low beds of 35 and 40 tons bring plant to the water's edge for loading.
- 04
Crew transfer
Speed boats carry crews to site, and house boats keep them on location.
- 05
Staging next to the quay
Yard and warehouse space beside the jetty holds materials until the barge is ready.
- 06
Vessel yard
Winsko builds its own barges, tug boats and house boats in its yard on the waterfront.
Method · 05 stages
How a load-out runs.
From the yard to the barge, with the checks that close each stage.
- 01
Stage on the yard
Pipe, plant and materials are received on the yard or in the warehouse beside the quay, checked against the cargo list and held until the barge is ready.
- Received against the cargo list
- Stored off the ground and under cover where needed
- Lifting gear inspected

Warehouse beside the yardPhotograph - 02
Bring plant to the quay
Heavy plant goes down to the waterfront on low beds and is positioned for loading, with the ground and the approach checked first.
- Route and ground checked
- Banksman for every move
- Plant secured on the trailer

Low bed at the waterfrontPhotograph - 03
Lift onto the barge
Cranes load the barge alongside the quay, heavy items to a lift plan, with the deck plan set so the barge sits true.
- Lift plan for heavy items
- Loads lashed and chocked
- Barge draught and trim checked

Line pipe loaded at the jettyPhotograph - 04
Tow and transfer
Tug boats tow the barges through the creeks to location, and the crews follow by speed boat.
- Tow plan agreed
- Life jackets for everyone on the water
- Radio contact with the base

Plant carried to a creek locationPhotograph - 05
Return and back-load
On the way back the barge brings empties, waste and surplus to the jetty, where it is unloaded and the deck cleared for the next job.
- Back-load list kept
- Waste landed to the right place
- Deck cleared before the next load
Plant and equipment
What works from the jetty.
Every item below is on Winsko's equipment register.
- Lay barges
- 600 t and 500 t
- Ramp barges
- 5 × 1,000 t, and one of 800 t
- Dump barges
- 400 t and 1,200 t
- Tug boats
- Own fleet, built in the Winsko yard
- Speed boats
- 5 × Yamaha
- House boats
- 80-man and 40-man
- Track crane
- 80 t
- Tyre cranes
- 3 × Grove 22 t, Terex 50 t
- Self-loader truck
- Mack with HIAB crane, 10 t
- Low beds
- Mack, 35 t and 40 t



Health, safety and environment
No life jacket, no entry.
The jetty is where land meets water, so the rules start at the gate and apply to everyone.
- 01
Working at the water's edge
A life jacket for everyone on the quay, the barges and the boats, and a head count at every transfer.
- 02
Lifting
Lift plans for heavy items, a banksman for every lift and nobody under a suspended load.
- 03
Plant at the waterfront
Marked routes for low beds and plant, banksmen for reversing and an exclusion zone around the loading barge.
- 04
Mooring and boarding
Guard-railed quay and decks, safe gangways and no boarding without permission.
- 05
Fuel and spills
Spill kits on every barge, bunded fuel storage and refuelling only at agreed points.
Video
Loading at the water.
FAQ · 05 questions
Questions, answered.
Short answers about the Winsko jetty, from the company profile.
01Does Winsko have its own jetty?
Yes. The base on the Trans-Woji waterfront in Port Harcourt has its own jetty, where all of Winsko's marine work is carried out. The 100,000-square-metre fenced base has a main gate and a second exit at the jetty.
02What does Winsko load at the jetty?
Pipe, plant, materials and crews for swamp, creek and river locations. Cranes load Winsko's lay, ramp and dump barges alongside the quay, low beds of 35 and 40 tons bring heavy plant to the water's edge, and tug boats tow the barges to site.
03What vessels and equipment work from the jetty?
Winsko's register lists ten lay, ramp and dump barges from 400 to 1,200 tons, tug boats, five speed boats, house boats for 40 and 80 people, an 80-ton track crane, tyre cranes from 22 to 50 tons and a 10-ton self-loader truck.
04Can materials be stored beside the jetty before loading?
Yes. Winsko leases yard and warehouse space on the base, next to the jetty, and clients stage materials there, from sand and chippings to equipment, before the barges carry them to swamp locations.
05What safety rule applies at the jetty?
No life jacket, no entry. Everyone on the quay, the barges and the boats, staff and visitors alike, wears a life jacket.
07Start a project
Have a project
to build?
Tell us the scope, the site and the schedule. Flowlines and pipelines, facility maintenance, wellhead platforms, civil or mechanical works, procurement or equipment on lease: our team in Port Harcourt will prepare a quote.
We can do it for you. Try us.
Start with a service
- 01Marine & Land Logistics
- 02Land/Swamp Equipment Leasing
- 03Procurement Services
- 04EPC Projects: Flowline & Pipeline Construction/Maintenance
- 05Oil & Gas Facility Maintenance
- 06Wellhead Platform Fabrication & Maintenance
- 07Road Construction
- 08Civil Engineering Construction
- 09Mechanical Engineering Construction/Fabrication
Each one opens the quote form with that service already chosen.
01Call
02Call
03Email
04Email
Operational base / jettyElshcon Close, Trans-Woji (Slaughter), Port Harcourt, Rivers State
See it on the map