Roads, civil & mechanical. Roads and civil engineering construction on land and at the waterside, and mechanical construction and fabrication in Winsko's own covered workshop.
The service
Roads built from the drain up.
Winsko builds and repairs roads: access roads to drilling locations for operators, and public roads for government. The work runs from drainage and earthworks through sand filling, stone base and compaction to asphalt, with plant from Winsko's own fleet.
For the Niger Delta Development Commission, Winsko carried out emergency repairs of failed and unmotorable road sections in Port Harcourt, Ughelli and Owerri in 2019. In 2021 it built the access road to the Owu-1 drilling location for Seplat Petroleum Development.
The photographs on this page are from Winsko's road works, stage by stage: drain formwork and concrete, grading, sand and stone base, compaction and asphalt.

Where it sits in the project lifecycle
- 01Engineering / Design
- 02Procurement & Logistics
- 03Fabrication
- 04Construction / Roads / Erection / Installation
- 05Testing / Pre-Commissioning
- 06Commissioning
- 07Operation, Maintenance & Handover
By the numbers
- 2019
- Public road repairs
- For the NDDC in Port Harcourt, Ughelli and Owerri
- 2021
- Owu-1 access road
- For Seplat Petroleum Development
- 3
- States
- Rivers, Delta and Imo
- 10+
- Concrete mixers
- As stated in the company profile
Scope of work · 06 work packages
What the work covers.
- 01
Access roads
New roads to well sites and drilling locations, built to carry heavy plant.
- 02
Road rehabilitation
Failed and unmotorable sections dug out and rebuilt, from base to surface.
- 03
Drainage
Formwork, open concrete drains and closed drainage along the road.
- 04
Earthworks
Clearing, excavation, grading and filling to the design levels.
- 05
Pavement layers
Sharp sand filling and stone base, each layer compacted before the next.
- 06
Asphalt surfacing
Asphalt laid by paver, rolled and finished to level.
Method · 06 stages
How a road section is built.
The sequence follows Winsko's own road photographs, with the checks that close each stage.
- 01
Survey and setting out
The route or failed section is surveyed, levels are taken, and the alignment, drains and traffic arrangements are set out before plant moves in.
- Levels and alignment recorded
- Existing services located
- Traffic management in place
- 02
Drainage
Drains are excavated, formwork is set and concrete is placed, open or closed, so the new road can shed water instead of failing again.
- Formwork lines and levels checked
- Concrete cubes taken
- Falls confirmed before backfill

Drain formworkPhotograph - 03
Excavation and grading
Failed material is dug out to firm ground and the formation is graded to the design levels.
- Soft spots removed
- Formation levels checked
- Spoil carted away

Grading the formationPhotograph - 04
Sand filling
Sharp sand is spread in layers over the formation, watered and rolled to build the road up to level.
- Layer thickness checked
- Compaction tested per layer
- Camber and levels checked

Sharp sand fillingPhotograph - 05
Stone base and compaction
The stone base is laid over the sand and compacted with the roller until it is firm and true, ready for asphalt.
- Base thickness checked
- Density tested
- Surface tolerance checked

CompactionPhotograph - 06
Asphalt
The wearing course is laid by paver, rolled and finished to level, and the road is reopened to traffic.
- Laying temperature checked
- Thickness and levels checked
- Markings and signs reinstated

Asphalt by paverPhotograph
Plant and equipment
Earthmoving plant from our own yard.
Every item below is on Winsko's equipment register, kept at the Trans-Woji base.
- Grader
- CAT 140G
- Bulldozer
- CAT D6H
- Roller / compactor
- 1 unit
- Excavators
- 3 × CAT 320 BL
- Backhoe
- CAT 446
- Payloaders
- CAT 966F and 950F
- Tippers
- 3 × Mack, 25 t
- Concrete mixers
- More than 10
- Low beds
- Mack, 35 t and 40 t



From site
Road works, from drain to asphalt.
Photographs from Winsko's road works: concrete drains cast in formwork, compacted stone base and fresh asphalt. The roads on record are public roads repaired for the NDDC in 2019 and the Owu-1 access road built for Seplat in 2021.
- Clients
- Niger Delta Development Commission; Seplat Petroleum Development
- Places
- Port Harcourt, Ughelli, Owerri; Owu
- Scope
- Drainage, earthworks, sand and stone base, compaction and asphalt
- Plant
- Winsko's own grader, bulldozer, roller, excavators and tippers
Photograph
Photograph
Photograph
PhotographTrack record
Roads on record.
From the list of jobs in the company profile.
- 2021Access road to the Owu-1 drilling locationOwu
- 2019Emergency repair of failed sections of Abowe RoadUghelli, Delta State
- 2019Emergency repair of failed sections of the Samagidi Agbarha road (lot 2)Ughelli, Delta State
- 2019Emergency repair of failed sections of Claret Catholic Church Road, World Bank AreaOwerri, Imo State
- 2019Emergency repair of the Ogbosisi to Umuguma market square roadOwerri, Imo State
- 2019Emergency repair of failed sections of Echendu Street, Elshcon Road and Road One, OkaniaPort Harcourt
Inspection and testing
Every layer tested before the next goes on.
Roads fail from the bottom up, so the checks start at the formation and follow every layer to the surface.
Codes commonly specified for this work
- FMW General SpecificationRoads and bridges (Federal Ministry of Works)
- BS 1377Soil testing
- BS EN 13285Unbound mixtures for road bases
- BS EN 13108Asphalt mixtures
- BS EN 12697Asphalt testing
- BS EN 206Concrete for drains and culverts
Health, safety and environment
Plant, people and the public.
Road works happen where people live and drive. The controls protect the crew and the public alike.
- 01
Traffic
Signed diversions, barriers and flag men, and work zones closed to the public.
- 02
Plant and people
Banksmen for reversing plant, exclusion zones around machines and hi-vis for everyone on site.
- 03
Excavations
Battered or supported sides, barriers at the edge and no entry without a permit.
- 04
Hot asphalt
Heat-resistant PPE, a cordon around the paver and burns first aid on site.
- 05
Dust and noise
Water spraying, working hours agreed with the community and plant kept maintained.
FAQ · 04 questions
Questions, answered.
Short answers about road construction at Winsko, from the company profile.
01Does Winsko build roads?
Yes. Winsko builds access roads to well sites and drilling locations and repairs failed public roads, from drainage and earthworks to sand filling, stone base and asphalt. In 2021 it built the access road to the Owu-1 drilling location for Seplat Petroleum Development.
02Which roads has Winsko repaired?
In 2019, for the Niger Delta Development Commission, Winsko carried out emergency repairs of failed sections of Echendu Street and Elshcon Road in Port Harcourt, Abowe Road and the Samagidi Agbarha road in Ughelli, and Claret Catholic Church Road and the Ogbosisi to Umuguma market square road in Owerri.
03What plant does Winsko use for road works?
Its own grader (CAT 140G), bulldozer (CAT D6H), roller, excavators, payloaders, Mack tippers and concrete mixers, kept on the base in Port Harcourt and moved to site on its own low beds.
04How is each road layer checked?
Levels are surveyed and compaction is tested on every fill and base layer before the next goes on, concrete cubes are taken from the drains, and asphalt is checked for laying temperature and finished thickness.
07Start a project
Have a project
to build?
Tell us the scope, the site and the schedule. Flowlines and pipelines, facility maintenance, wellhead platforms, civil or mechanical works, procurement or equipment on lease: our team in Port Harcourt will prepare a quote.
We can do it for you. Try us.
Start with a service
- 01Marine & Land Logistics
- 02Land/Swamp Equipment Leasing
- 03Procurement Services
- 04EPC Projects: Flowline & Pipeline Construction/Maintenance
- 05Oil & Gas Facility Maintenance
- 06Wellhead Platform Fabrication & Maintenance
- 07Road Construction
- 08Civil Engineering Construction
- 09Mechanical Engineering Construction/Fabrication
Each one opens the quote form with that service already chosen.
01Call
02Call
03Email
04Email
Operational base / jettyElshcon Close, Trans-Woji (Slaughter), Port Harcourt, Rivers State
See it on the map