03Services · 06
All servicesWellhead Platform Fabrication & Maintenance
Pipelines, facilities & platforms. EPC projects on flowlines and pipelines, the facilities they feed, and the wellhead platforms at the end of them: built, maintained and kept in service.
The service
Wellhead platforms, fabricated, installed and kept in service.
This is the work around the wells and flow stations: wellhead platforms fabricated and set over the creek, platform decks and drain platforms, piled foundations, manifolds, skids, and the piping that connects them to production. Winsko also maintains platforms already in service: repairs, refurbishment, replacement and hook-up.
Most of it is fabricated in Winsko's own workshop under a 50-ton overhead crane, then loaded onto its own barges at the Trans-Woji jetty and carried to swamp and creek locations, where crane barges and swamp buggies set it in place.
On a live field the installation is only half the job. Tie-ins, modifications and hook-ups are planned with the operator around production, so that new equipment goes in without an unplanned shutdown.

Where it sits in the project lifecycle
- 01Engineering / Design
- 02Procurement & Logistics
- 03Fabrication
- 04Construction / Roads / Erection / Installation
- 05Testing / Pre-Commissioning
- 06Commissioning
- 07Operation, Maintenance & Handover
By the numbers
- 50 t
- Workshop overhead crane
- Fabrication under cover, at the Trans-Woji base
- 80 t
- Track crane
- Crawler crane for lifting platforms and skids
- 1,200 t
- Largest barge
- Dump barge; the fleet also has two lay barges of 600 t and 500 t
- 2014
- First platform installation on record
- Installation and demob of a platform at Diebu Creek flow station
Scope of work · 06 work packages
What the work covers.
- 01
Wellhead platforms
Fabrication, installation and hook-up of wellhead platforms in swamp and creek locations.
- 02
Platform decks
Deck works, drain platforms, utility house platforms, walkways and helipad structures.
- 03
Piling and foundations
Piled foundations for platforms and flow station equipment.
- 04
Manifolds and skids
Production and gas-lift manifolds, metering skids and their associated piping.
- 05
Facility modifications
Piping changes, strainers and new connections on operating flow stations.
- 06
Platform maintenance
Repairs, refurbishment and replacement of wellhead platforms and their hook-up arms, with scaffolding and safety mesh.
Method · 06 stages
From the workshop floor to the wellhead.
How a platform or skid is built and set, with the checks that close each stage.
- 01
Fabrication
Steelwork and piping are cut, fitted and welded in the workshop to the approved drawings and welding procedures, then blasted and painted under cover.
- Dimensions checked against the drawing
- Welds inspected and logged
- Coating thickness checked

Fabrication workshopPhotograph - 02
Load-out
Finished structures are lifted onto Winsko's barges at the jetty, sea-fastened and towed to site.
- Lift plan for every heavy lift
- Sea-fastening checked before sail-away
- Marine crew briefed

Load-out at the jettyPhotograph - 03
Piling and foundations
Piles are driven to the design depth or refusal and cut to level, giving the platform or skid a firm, level base in soft swamp ground.
- Pile positions set out
- Driving record for every pile
- Cut-off levels checked

Welding on a platform jacketPhotograph - 04
Setting and levelling
The crane barge sets the jacket, deck or skid on its foundation; it is levelled, aligned and welded or bolted down.
- Level and orientation checked
- Connections completed and inspected
- Temporary works removed

Platform installationPhotograph - 05
Tie-in and hook-up
Piping is connected to the wellhead, manifold or flow station at the agreed points under the operator's permit to work.
- Isolation agreed with the operator
- Closing welds fully inspected
- Bolted joints torqued and tagged

Wellhead hook-upPhotograph - 06
Testing and hand-over
New piping is flushed and pressure-tested, the installation is checked against the punch list, and the as-built records go to the operator.
- Pressure test witnessed
- Punch list closed out
- As-built drawings handed over

Crew on a wellhead platformPhotograph
Plant and equipment
Lift it, carry it, set it, with our own plant.
Heavy lifts over water need cranes, barges and tugs on the same plan. These come from Winsko's own register.
- Workshop overhead crane
- 50 t
- Track crane
- 80 t, crawler
- Tyre cranes
- 3 × 22 t and 1 × 50 t
- Self-loader truck
- 10 t, HIAB
- Barges
- Lay, ramp and dump, 400 t to 1,200 t
- Hydraulic shop press
- 75 t
- Low beds
- 35 t and 40 t
- Blasting and painting
- Atlas Copco, Basfer, Graco



From the record
Wellhead platform, Cawthorne Channel 1
A new wellhead platform installed over the creek at Well 16, with hook-up of the replaced 1.6 km flowline. The platform and pipe went out from the Trans-Woji jetty by barge.
- Scope
- Wellhead platform installation and hook-up
- Line
- 4-inch Schedule 40 flowline, 1.6 km
- Setting
- Creek location, Cawthorne Channel, Rivers State
- Spread
- Crane barge, swamp buggy, tug boats, house boat
Photograph
Photograph
Photograph
PhotographTrack record
Platforms, manifolds and modifications on record.
A selection from the list of jobs in the company profile.
- 2024Wellhead platform installation and hook-up, Well 16Cawthorne Channel 1
- 2022Piping modifications at the flow station for crude barging to a process bargeAlakiri flow station
- 2019Wellhead platform construction and installation, PMMO-1Akaso
- 2019Platform repairs, Well 7LSAlakiri
- 2018Wellhead platform refurbishment and hook-up, Well 24Cawthorne Channel
- 2017–18Manifold platform modification and bulk production manifoldOrubiri
- 2017Utility house platform with structural and piping rehabilitationKrakama flow station
- 2016Wellhead platform replacement, Well 11TAlakiri
- 2014FLKO and PDV drain platform deck works, platform installation and piling foundationsDiebu Creek flow station
Inspection and testing
Built to the drawing, proven on site.
Each structure carries its records from the workshop to the field: material certificates, weld and coating inspections, piling logs and the final test.
Codes commonly specified for this work
- API RP 2AFixed platforms
- AWS D1.1Structural welding
- ASME B31.3Process piping
- ASME IXWelding qualifications
- ISO 12944Protective paint systems
- API 6AWellhead equipment
Health, safety and environment
Heavy lifts, over water, next to live wells.
Installation stacks the hazards: big lifts from barges, work over water, piling noise and vibration, and tie-ins on producing fields.
- 01
Heavy lifts
An engineered lift plan for each heavy lift, certified rigging, one banksman, and nobody under the load.
- 02
Work over water
Life jackets, edge protection on decks and a rescue boat on standby.
- 03
Piling
Exclusion zone around the hammer, hearing protection and checks of the pile and leader alignment.
- 04
Live wells
Simultaneous operations planned with the operator, permit to work and continuous gas monitoring.
- 05
Hot work
Hot work permits, fire watch and extinguishers; no hot work near live equipment without gas clearance.
- 06
Towing and mooring
Tow plan, weather check before sail-away, and mooring lines kept clear of the crew.
FAQ · 05 questions
Questions, answered.
Short answers about wellhead platform fabrication & maintenance at Winsko, from the company profile.
01What wellhead platform work does Winsko do?
Fabrication, installation, hook-up, repair, refurbishment and replacement of wellhead platforms in swamp and creek locations, together with platform decks, drain and utility house platforms, piled foundations, manifolds and skids.
02Where are the platforms fabricated?
Most of the steelwork is fabricated in Winsko's own covered workshop in Port Harcourt, under a 50-ton overhead crane, then loaded onto its own barges at the Trans-Woji jetty and set in place on site by crane barge and swamp buggy.
03Does Winsko maintain platforms that are already in service?
Yes. Winsko has repaired platforms at Alakiri, refurbished and hooked up a wellhead platform at Cawthorne Channel (Well 24, 2018) and replaced a wellhead platform at Alakiri (2016).
04Can installation be done on a producing field?
Yes. Tie-ins, modifications and hook-ups are planned with the operator around production, so new equipment goes in without an unplanned shutdown.
05What lifting capacity does Winsko have?
An 80-ton track crane, tyre cranes from 22 to 50 tons and a 50-ton overhead crane in the workshop, with lay barges of 600 and 500 tons and barges up to 1,200 tons to carry the loads.
07Start a project
Have a project
to build?
Tell us the scope, the site and the schedule. Flowlines and pipelines, facility maintenance, wellhead platforms, civil or mechanical works, procurement or equipment on lease: our team in Port Harcourt will prepare a quote.
We can do it for you. Try us.
Start with a service
- 01Marine & Land Logistics
- 02Land/Swamp Equipment Leasing
- 03Procurement Services
- 04EPC Projects: Flowline & Pipeline Construction/Maintenance
- 05Oil & Gas Facility Maintenance
- 06Wellhead Platform Fabrication & Maintenance
- 07Road Construction
- 08Civil Engineering Construction
- 09Mechanical Engineering Construction/Fabrication
Each one opens the quote form with that service already chosen.
01Call
02Call
03Email
04Email
Operational base / jettyElshcon Close, Trans-Woji (Slaughter), Port Harcourt, Rivers State
See it on the map