Logistics, leasing & supply. Marine and land logistics from Winsko's own jetty, land and swamp plant on lease, and materials sourced, checked and delivered to site.
The service
The right material, certified, on the right barge.
Procurement sits inside most of Winsko's jobs: line pipe and fittings for new and replacement flowlines, materials for flow station refurbishments, and hoses and connectors for crude barging operations. Winsko describes itself as an engineering, procurement and logistics contractor, and buys to the client's specification, locally or abroad.
What matters on a swamp job is that the material arrives complete, certified and in time for the barge. Winsko checks each item against its specification and certificates on receipt, stores it in its warehouse on the Trans-Woji base, and loads it out at its own jetty with the rest of the spread.
Clients also use the base for their own materials: the warehouse and yard are leased for storage and staging before marine mobilisation.

Where it sits in the project lifecycle
- 01Engineering / Design
- 02Procurement & Logistics
- 03Fabrication
- 04Construction / Roads / Erection / Installation
- 05Testing / Pre-Commissioning
- 06Commissioning
- 07Operation, Maintenance & Handover
By the numbers
- 100,000 m²
- Base for storage and staging
- Yard, warehouse and jetty at Trans-Woji, Port Harcourt
- 5
- Container stores
- Two 40 ft and three 20 ft units, alongside the warehouse
- 10 t
- Self-loader truck
- Mack HIAB for moving material on and off the base
- 2001
- Incorporated
- Engineering, procurement and logistics contractor
Scope of work · 06 work packages
What the work covers.
- 01
Line pipe and fittings
Pipe, bends, flanges, valves and fittings for flowlines and gas-lift lines.
- 02
Flow station materials
Piping, structural steel and fittings for refurbishments and modifications.
- 03
Consumables and hoses
Welding consumables, clamps, hoses and connectors for field operations.
- 04
Expediting and inspection
Following orders to delivery, and checking material and certificates.
- 05
Shipping and clearing
Bringing imported material through to the base in Port Harcourt.
- 06
Storage and load-out
Warehouse storage, preservation and load-out at the jetty.
Method · 05 stages
From the specification to the barge.
How an order runs, with the checks that close each stage.
- 01
Specification and take-off
Quantities and specifications come from the drawings and the client's requirements, item by item, before anything is ordered.
- Material take-off checked against drawings
- Specification and grade confirmed
- Certificates required listed
- 02
Sourcing and order
Quotes are compared on price, delivery and compliance, and the order is placed with the supplier that meets the specification and the date.
- Supplier meets the specification
- Delivery date fits the job
- Order confirmed in writing
- 03
Expediting and shipping
The order is followed to dispatch; imported material is shipped and cleared through to Port Harcourt.
- Progress followed with the supplier
- Shipping documents complete
- Clearing done before the material is needed
- 04
Receipt and inspection
On arrival, every item is checked against the order, its markings and its certificates, and anything wrong is quarantined.
- Heat numbers match the mill certificates
- Visual and dimensional check
- Non-conforming items quarantined

Coated line pipePhotograph - 05
Storage and load-out
Material is stored in the warehouse or on the yard, preserved, and loaded onto the barges at the jetty with the rest of the spread.
- Pipe stored off the ground with end caps on
- Stock tracked to the job
- Loaded to the load-out plan

WarehousePhotograph
Plant and equipment
Somewhere to keep it, and a way to move it.
Storage, handling and transport that Winsko owns, from its equipment register and company profile.
- Warehouse
- Roofed, on the base; also leased to clients
- Container stores
- 2 × 40 ft and 3 × 20 ft
- Self-loader truck
- Mack HIAB, 10 t
- Low beds
- Mack, 35 t and 40 t
- Payloaders
- CAT 966F and 950F
- Barges
- Ramp and dump, 400 t to 1,200 t



Track record
Materials supplied, on record.
A selection from the list of jobs in the company profile.
- 2022Procurement of additional hoses and connectors for barging operationsAlakiri and Cawthorne Channel
- 2017Materials for the flow station refurbishmentKrakama
- 2017Flowline construction materials for Wells 8, 14L and 16SKrakama
- 2016Gas flowline construction materials, Well 27LAlakiri
Inspection and testing
Certificates first, then the barge.
The documents are part of the delivery. Material without the right certificates does not leave the base.
Codes commonly specified for this work
- EN 10204 3.1Inspection certificates
- API 5LLine pipe
- ASME B16.5Flanges
- ASME B16.9Butt-weld fittings
- API 6DPipeline valves
- ISO 21809Pipe coatings
Health, safety and environment
Heavy, awkward loads, handled safely.
Pipe and fittings are heavy and awkward. Most incidents in procurement happen while material is being moved.
- 01
Lifting and handling
Certified slings and spreader bars, tag lines on pipe, and no one under the load.
- 02
Road transport
Loads secured and inspected, trained drivers and journey plans for long hauls.
- 03
Storage
Pipe chocked and stacked to safe heights; walkways kept clear.
- 04
Load-out
Lift plan at the jetty, barge loading sequence agreed and life jackets at the water's edge.
- 05
Hazardous goods
Paints, gases and chemicals stored apart, labelled and with their safety data sheets.
- 06
Fire
Extinguishers in the warehouse, no hot work near stored materials and a clear muster point.
FAQ · 03 questions
Questions, answered.
Short answers about procurement services at Winsko, from the company profile.
01What does Winsko procure?
Line pipe, bends, flanges, valves and fittings for flowlines, piping and steel for flow station work, welding consumables, clamps, hoses and connectors, bought to the client's specification locally or abroad.
02How is procured material checked?
Each item is checked against its specification and certificates on receipt, stored in Winsko's warehouse on its Port Harcourt base, and loaded out at its own jetty with the rest of the spread.
03Can Winsko store and deliver materials to swamp sites?
Yes. Material is held in the warehouse and container stores on the Trans-Woji base, moved with a 10-ton self-loader truck, and carried to swamp and creek locations on Winsko's own barges.
07Start a project
Have a project
to build?
Tell us the scope, the site and the schedule. Flowlines and pipelines, facility maintenance, wellhead platforms, civil or mechanical works, procurement or equipment on lease: our team in Port Harcourt will prepare a quote.
We can do it for you. Try us.
Start with a service
- 01Marine & Land Logistics
- 02Land/Swamp Equipment Leasing
- 03Procurement Services
- 04EPC Projects: Flowline & Pipeline Construction/Maintenance
- 05Oil & Gas Facility Maintenance
- 06Wellhead Platform Fabrication & Maintenance
- 07Road Construction
- 08Civil Engineering Construction
- 09Mechanical Engineering Construction/Fabrication
Each one opens the quote form with that service already chosen.
01Call
02Call
03Email
04Email
Operational base / jettyElshcon Close, Trans-Woji (Slaughter), Port Harcourt, Rivers State
See it on the map